Project Description:

This project is defined to recover the flare gases of flare No. 5 in phase-3 of Abadan Refinery and reusing the recovered gas as the fuel gas.

Branched flare gas is designed to be routed to the recovery unit (FGRU) under controlled flow (design flow = 6000 kg/hr). In FGRU, the gas will be knocked out and pressurized and then added to refinery’s fuel gas system.

A compressor system (3 liquid ring compressors + 1 spare) is designed for pressurizing of flare gas.

 

Scope of Work:

  • Feasibility Study of the project based on the existing plants process information and find out the optimum process design
  • Preparation and delivery of the basic engineering package
  • Preparing complete tender document for detail engineering, procurement, construction works and commissioning services (EPCC)

 