Project description:
The wellhead booster stations in operational areas of Gachsaran Oil & Gas Production Company are established for receiving crude oil from the wells within their relevant catchment areas, separating the oil and gas phases, and transferring the oil and gas streams to downstream facilities.
Due to the aging of these facilities, the Client intends, as part of the Instrumentation and Control Systems Upgrade and Modernization Project for the booster stations, to convert the control systems and transmitters of selected stations from pneumatic to electronic technology.
The booster stations covered under the Scope of Work of this project are as follows:
The scope of services of ANEDCO in this project is briefly defined as follows: Conducting field surveys and data gathering, preparation of a comprehensive report on the current status of the control and instrumentation systems of the booster stations; development of a feasibility study and design of the new control system and transmitters; preparation of basic engineering documents and the FEED Package based on the new design; preparation of EPC tender documents; and estimation of engineering services, procurement, installation and commissioning costs for the new system across all booster stations included in the project scope.