Project Description:

The incoming crude oil is providing from five offshore oil fields including SIRI A, SIRI B, SIRI D, SIRI E, and NOSRAT These Facilities are including:

  • Oil incoming and treatment facilities with approximate capacity of 100 000 BPD
  • (Crude oil storage and loading facilities (3 tanks of 1 000 000 bbl capacity, each
  • Gas treatment facilities with capacity of 11 4 MMft 3 /day
  • Sea water treatment system with capacity of 84 000 BPD ..(Including
  • filtration system, deaeration system, injection system, etc
  • All related utility systems

The final goal of the project was upgrading and changing of the existing obsolete pneumatic and electronic field instruments and control systems using the latest technologies and new DCS and ESD systems

Scope of Work:

  • Review of all process areas
  • Simulation of process
  • Process basic engineering
  • Detail engineering
  • HAZOP study
  • Hot and cold procedure