Project Description:
The gas treating plant for the Sarakhs Neka gas supply project is designed to process sour gas and to provide 1 180 000 NM 3 hr of gas to theSarakhs Neka pipeline Theplant includes the following unit:
- Five DEA Acid Gas Removal Units.
- Five DEW Point Control Units.
- Three Clans Sulfur Storage Facility.
- Supporting Utility for All of the Above.
.(Shahid Hashemi Nejad Gas Processing Company defined a project for acid (gas enrichment of Gas Treating Unit No 2 (GTU
Scope of Work:
- Conceptual Design of the project based on the existing plant process information and find out the optimum process design.
- Preparation and delivery of the basic engineering package.
- Performing detail engineering and preparation of scope of work and tender documents for PC contract.