Project Description:

The gas treating plant for the Sarakhs Neka gas supply project is designed to process sour gas and to provide 1 180 000 NM 3 hr of gas to theSarakhs Neka pipeline Theplant includes the following unit:

  • Five DEA Acid Gas Removal Units.
  • Five DEW Point Control Units.
  • Three Clans Sulfur Storage Facility.
  • Supporting Utility for All of the Above.

.(Shahid Hashemi Nejad Gas Processing Company defined a project for acid (gas enrichment of Gas Treating Unit No 2 (GTU

Scope of Work:

  • Conceptual Design of the project based on the existing plant process information and find out the optimum process design.
  • Preparation and delivery of the basic engineering package.
  • Performing detail engineering and preparation of scope of work and tender documents for PC contract.