Project Description
This project is consisting of 3 parts including Desalting, Flare Managing and Connection Line Design
Desalting
As the salinity of plant s feed (receiving from Tabnak Vavary and Shanul gas fields) is gradually increasing The scope of this part of project is designing a desalter package for each of No 400 No 500 and No 103 units Desalter package will be located after the stabilizer in each unit The design target is to decrease the salinity to the acceptable range based on IOM regulations and international standards
Flare Managing
The scope of this part is to review and redesign of the complete flare system in
units 400 500 140 and finding solution for defined items, mainly including
Review of existing flares and finding the best solution for decreasing the required purge gas.
Redesign of flaring network and flare headers based on HP/LP detachment concept
Complete revamping of flares ignition system and pilots
Connecting the cold vent of compressor station to existing flare system
Connection Line
This part includes design of a connecting line for connecting unit 100 (in parsian - IPlant) to the existing connection line between units 400 and 500 (in parsian ه=Plant) considering all process and control requirements and routing limitations.
Scope of Work:
Feasibility Study of the project based on the existing plants process
information and find out the optimum process design in each part
Preparation and delivery of the basic engineering package in each part
Performing detail engineering and preparation of tender documents for
construction and installation works at site in each part